LLRA is designated as a Neighbourhood Forum and is developing a 2025-2040 Neighbourhood Plan for the Long Leys area. An Early-Stage community consultation started on Monday 12 January 2026 and finished on Sunday 8 March 2026. Responses to the consultation will be published once the plan is revised for a Regulation 14 Consultation.
Read the Early-Stage draft Long Leys Neighbourhood Plan v1.3a and Appendix 1 Local Green Space Assessment Report .
Supporting & Supplementary Documents (SSD)
In addition to the plan document itself, there were a number of Supporting & Supplementary Documents (Click on individual links to view each document).
- SSD-1: Neighbourhood Area Designation – Map
- SSD-2: Housing Needs Assessment – 2019
- SSD-3: Summary of Community Survey Results
- detailed data and analysis from the Long Leys Residents’ Survey March 2024, including charts and percentages for each question.
- SSD-4: Long Leys Design Codes and Guidance (2024)
- a comprehensive design guide prepared by AECOM, providing illustrations and specifications to complement Policy 2 of the Neighbourhood Plan.
- SSD-5: Potential Development Options for Long Leys: Drop-in Event Summary
- SSD6: Concept Plans for Key Sites – illustrative masterplan concepts as shared during community consultations for:
- (i) Albion Works Mixed-Use redevelopment
- (ii) Land South of A46 development concept (Temple Garth plan)
(Note: these are for reference and not fixed development plans).
- SSD-7: Community Masterplan for the Albion Works Site – 2025
- SSD-8: Green Infrastructure Report
